WHEREAS staff have identified that the entire length of the gravel road from Franktown Rd to 1 km south of Beckwith 9th Line Rd is a priority for upgrade; and
WHEREAS due to vehicle volumes, Ashton Station Road meets warrants for a full upgrade to paved surfacing; and
WHEREAS the road is a border road with the Township of Beckwith; and
WHEREAS the maintenance and upgrading of the road is a shared responsibility between the Township of Beckwith and the City of Ottawa; and
WHEREAS the City does not presently have an agreement in principle from Beckwith for any upgrade of Ashton Station Road in 2025.
THEREFORE BE IT RESOLVED that Ashton Station Road from Franktown Rd to 1 km south of Beckwith 9th Line Rd be added to the list of projects identified as being “below budget cut-off line” for budget line item 911289 24-26 Rural Road Upgrades; and
BE IT FURTHER RESOLVED that the Manager, Right-of-Way, Heritage and Urban Design, in consultation with other staff as required, be directed to seek to negotiate a Boundary Road Agreement or Boundary Road Capital Renewal Agreement and Project Scope with the Township of Beckwith to address cost-sharing and liabilities with respect to the re-surfacing of Ashton Station Road from Franktown Road to approximately 1 km south of Beckwith 9th Line Road.