Committee of Adjustment

Panel 3

-
Ben Franklin Place, The Chamber, Main Floor, 101 Centrepointe Drive, and by electronic participation

The hearing can be viewed on the Committee of Adjustment YouTube page. For more information, visit Ottawa.ca/CommitteeofAdjustment

Simultaneous interpretation in both official languages, accessible formats and communication supports are available for any specific agenda item by calling the Committee information number at least 72 hours in advance of the hearing.

Panel Members:

Chair: William Hunter

Members: Jocelyn Chandler, Beth Henderson, Martin Vervoort, Terry Otto


(Raynald Lavigne & Francine Perras)


To permit the construction of a detached garage with a reduced interior side yard setback and a reduced setback to a watercourse.


(Raynald Lavigne & Francine Perras)

(12908824 Canada Inc.)


To permit increased lot coverage for the expansion of the existing greenhouse.


(Agent: Corrine Turansky)

(Mary and Wayne Ryan and the Estate of Mary Theresa Ryan)


To subdivide the property into two separate parcels with a reduced lot width and setbacks from a Mineral Extraction Zone and cattle barn.


(Agent: Ken Dunham - Dilshad Mohamed)

(Mary and Wayne Ryan and the Estate of Mary Theresa Ryan)


To subdivide the property into to separate parcels with a reduced lot with and setbacks from a Mineral Extraction Zone and cattle barn.


(Agent: Ken Dunham - Dilshad Mohamed)